language

You are here: Home > Latest product

Contact us

Company:SHENZHEN PENGLAI Industrial Corporation Limited

Factory Address:403B, No.99 Qiaocheng East RD,Nanshan District,Shenzhen,Guangdong ,China

Factory ADDRESS:St George Industrial Park,XinYu Road,ShaJing Town,Bao'an District,Guangzhou City,China

Contact:Jack Du
Cel:+86-15811882441
Phone:+86-755-86718316
Fax:+86-755—25417648
Email:penglaipacking@gmail.com
Email:postmaster@penglaipacking.com
Skype:turnanewleaf
Website:www.penglaichina.com
www.youtube.com/user/penglaichina

Latest product

Liquid chocolate honey sauce mixing heating filling three lanes packing machine high speed 3 tracks VFFS bagging system solution

Date:2017-04-29
Published by:PENGLAI INDUSTRIAL CORPORATION
Cel:+86-15811882441
Phone:+86-755-86718316
Email:penglaipacking@gmail.com
Email:postmaster@penglaipacking.com

Now Price:$27995.00

Contact

YX-LM520-L03 multilanes packing machine VFFS packaging bagging solution is a full automatic packing machine with high quality and high performance made by this co.,ltd through introducing, digesting and absorbing advanced technology from abroad, and has a series of automatic functions, such as automatic-delivering, measuring, bag-making, sealing, date printing, finished product exporting.

This machine adopts high precision servo film-transferring system, PLC program control, advanced touch-type human machine interface, photoelectric automatic positioning tracing and digital type temperature control, which make operation of the complete machine simpler, perfect, and it is the first-choice equipment for improving producing efficiency, decreasing labor intensity, upgrading packing level in food packing industry.

Performance and Specifications of multilanes packing machine VFFS bagging system:

drawing of packing machine.jpg

THREE lanes packing machine.jpg

Notice: Packing speed according to packing material and packing weight .packing materials should be used in rolls, the outer diameter should be 400mm, inner diameter of framework should be Φ75mm, thickness of compound packing material should be 0.05-0.08mm, surface of the packing material should be smooth without wave, in the range of 10mm on the side should not have printed pattern and characters (namely the grounding should be pure), contrast between color dot and grounding should be obvious.

2.A►Arrangement plan of the complete machine

liquid packing machine 3lanes.jpg

3. Installation notice

1). Packing machine and finished product transferring machine should be connected with 220VAC power supply with earth leakage protection and a current of more than 10A

2). Automatic lifting machine should be connected with 3-phase 380VAC power supply with earth leakage protection and open-phase protection and a current of more than 10A.

3). Please dont forget to install earth wire.

4). Connect the air source with entrance of triplet of packing machine.

5). Use elevator to transfer material into big material hopper at the top of packing machine.

6). Install date printing ink ribbon 

7). Install packing film. 

 

1)Loosen the handle

handle.jpg         

 

2)Put in packing film

    roll of film.jpg

3) Bold line direction indicated in the chart passes through the packing film and move it along a continuous line, and lead the packing film into the bag former(Vertical sealing device should be opened first).

film winding illustration.jpg 
4)After lead the packing film enter bag former, adjust swing lever to make packing film pass through feeding tube. At this time, film-delivering switch and film motor at the bottom of packing machine enter automatic work status.

3 lanes packing machine liquid bagging in factory.jpg

Operation methods

1) Open the total power of the machine, then preheat the vertical and horizontal sealing jaw date printer to the temperature setting and the horizontal sealing jaw which parts should be add some adequate lubricating oil.

2)Please pay attention to check the cleanliness of the tooth surface of vertical and horizontal sealing jaw.

3)Please check the equipment of the code date, packing film right or wrong, and check the Electronic location.

4)Open the switch of the printer of the date, and send the packaging film to the intended location. Open the motor, make 4-5 empty bags and then stop it. Check the bags is qualified, if done then open the materials falling switch to work.

5)First to shut down the materials falling switch when it needs to cut off the power,and then related the electrical power supply ,so as not to damage folders, tool damage.

Equipment maintenance

1Before on or off duty, it is necessary to clean interior and exterior of the machine, thoroughly sterilize the parts passed by food

2Before on or off duty every day, please check if 1/3 of the oil table of air source air source triplet oil storage jar is maintained, is less, it is necessary to pour 20# pure and clean oil until about 1/2 of the jar body.

3Before start every day, pour 20# machine oil into oil cup on the horizontal sealing support until it becomes full.

4Before off duty, it is necessary to take off unused packing film so as to prevent from bending supporting tube.

5During the process of start, if material is clamped in vertical sealing or horizontal sealing, it is necessary to stop the machine immediately and clean tooth surface of vertical sealing or horizontal sealing with brass wire brush.

►Spare parts list

SPARE list together with machine.jpg

horizontal sealing heater     4 set

vertical sealing heater        1set

interior hexagonal spanner  4-10mm  1 set

copper brush 120mm                  1 piece

cutter         220mm                1set

oil kettle           150ml          1 piece

character grain                     1 box

ALL RIGHTS RESERVED by ®PENGLAI INDUSTRIAL CORPORATION LIMITED

Related Product